Preventive Maintenance Services

Preventive Maintenance Benefits

  • Reduce equipment outages: Non-planned outages are significantly reduced mitigating product loss (food or other)
  • Extend equipment life: Cleaning and tuning your gear will improve operational efficiency which reduces repair requirements and appliance replacement. Energy savings may also be observed.
  • Mitigate risk of being shut down by food inspectors

High Level Sequence

  1. Go to site to perform the Preventive Maintenance on appliances according to checklist(s) below
  2. As a follow up to the Preventive Maintenance, KRS provides a report and sends quote(s) for any required additional actions such as parts replacements, ice machine descaling, etc.

Ice build-up on the evaporator coils - Walk-in coolers and freezers

 

Background:

Ice build-up on the evaporator coils (inside the walk-in, behind the fans) is sometimes caused by excessive warm air coming into the unit. The warm air turns into condensation which turns into ice buildup behind the coils and into the fans. The ice makes it difficult for the compressor to cool the unit, so it runs continuously and as a result keeps building up the ice and temperature keeps going up - a snowball effect. This happens mostly during summer when temperature and humidity are high. If unattended long term it may cause damage to the compressor and other components.

 

Cause

Warm air entering through the door can be caused by:

·         door not closing properly

·         door gasket is damaged

·         door sweep is damaged

·         door closer is not functioning properly

·         door left open too long while loading new product

 

Note that there are many other causes related to ice build up in the system such as defective defrost timer, elements, defrost termination switch, thermostat, refrigerant leaks etc. We are not covering those here.

 

Prevention

If you know ahead of time that you'll have the door open for an extended period of time to load new product, shut the compressor / condensing unit off. This can be done by adjusting the thermostat to higher than room temperature to prevent the compressor from turning on. Another way is to power down the compressor (condensing unit) at the electrical panel where possible.

Do not turn off the evaporator coil (large component mounted on ceiling inside the walk-in with the fans). Leave that one powered on.

If the power breaker turns off both the condensing unit and the evaporator coil, that’s ok. The key is the compressor needs to be turned off to prevent ice build up. Leave it like that for the duration of product loading. Once done return the thermostat to the original setting or power unit back up.

 

Melting the ice:

1.      Power down the compressor (or turn up thermostat to higher than room temperature). For walk-in units, try to remove power to the condensing unit (compressor) while leaving the evaporator (fans inside) powered on. That will accelerate the de-icing process. If that’s not possible, power the whole thing down or raise the thermostat to above room temperature (80F, 30C). Important thing is the compressor must be powered down during the ice melting phase otherwise the ice will continue to build up while you’re trying to melt it.

2.      Move product to another unit if possible.

3.      Leave unit off until all the ice is completely melted. It might require to be off overnight.

4.      Check for ice behind the evaporator coils (behind the fans inside the cooler/freezer). Also check the condensate pan under the fans. All ice must be melted prior to turning the unit back on otherwise the ice building cycle will start up again. If you want to help the ice melting, you can put hot water in a hand spray bottle and squirt it on the ice. You must never use a water hose connected to city water or anything that will damage the coils. Remember the evaporator coils and fins are fragile and expensive to replace.

5.      Once all ice is completely gone, power up the unit (or return the thermostat to original setting) and watch the temperature come down to proper temp. If it does not reach proper temp, call us and we'll send a technician to diagnose the problem.

 

Preventive Maintenance Checklist For Refrigeration Appliances

  1. Clean evaporator & condenser coils with high pressure nitrogen (includes roof top)
  2. Check lines for condensation
  3. Clean fan blades and fan cages and inspect the fan motor
  4. Check the integrity of insulation, quote replacement if required
  5. Check for air leaks through cracks, holes and worn parts like gaskets and seals
  6. Lubricate door hinges where required
  7. Insure proper closure/self-closing
  8. Level unit
  9. Check drain lines
  10. Check all settings and ensure optimal operation
Keen Restaurant Services - Refrigeration Maintenance

Preventive Maintenance Checklist For Gas Appliances

  1. Perform temperature checks, calibrate where required
  2. Inspect for oil or gas leaks
  3. Doors open/close properly
  4. Gas connection is secure
  5. Gas hose meets regulations
  6. Appliance must have its own a gas shut off valve
  7. Gas appliance on wheels must have a wall restraint
  8. Main gas shut-off valve must be clearly indicated and easy to shut off
  9. Instructions on how to re-light each gas appliance after a shutdown are readily available
Keen Restaurant Services - Gas Appliance Maintenance

Preventive Maintenance Pricing Guidelines

  • Service charges a flat fee of $50 for each service visit
  • Travel charges full travel: $98 and Half Travel: $49. The travel charges are contingent upon the distance to the service location
  • Hourly rate is $110/hour and $55 for each half hour that follows. We bill in increments of 30mins after the first hour (example: 2.5 hours would be $275)
  • Rough estimate 15-30 mins per device depending on its condition. Typically walk-in units are 30mins each and low-boys, reach-ins, standalones are 15mins each
  • Nitrogen is $65 per cylinder. An average size kitchen uses about 2 cylinders
  • Degreaser $20 per can. An average size kitchen uses about 2 cans

You now have two methods to manage your Preventive Maintenance:

  1. On demand - email us or call us to request a PM 
  2. Maintenance Contract - we set the frequency and scheduling up front and invoice you a flat rate per visit that you can add to your budget (frequency can be 2, 3 or 4 PMs per year)
  3. We offer estimates upon receiving a list of equipment that requires maintenance

We require a list of your appliances to provide an accurate quote.